Erection

At Roundhouse we work alongside you through your entire project process. We will undertake the entire build process through the following stages giving help and support at every stage.

Stage 1


All of the materials arrive on site on the back of a single trailer and are unloaded carefully in order of erection.

Stage 2


The kingpin is put in place ready to start the metalwork. The fabric roof is attached.

Stage 3


The fabric roof is carefully unrolled over the first half of the truss work before the remainder of the truss work is attached.

Stage 4


The rafter and cantilever are attached and all of the metal work bolts are tightened.

Stage 5


The roof is tensioned on the ground using steel cables and the rainwater harvesting system is completed.

Stage 6 


The roof is constructed on the ground before being raised, using hydraulics, up the centre pin, when the legs are dropped in to place - simple!!

FINISHED!